
See what's inside
What's included
- Instant download after purchase
- Lifetime re-download from your account
Scheduling Templates
Crane & Specialty-Asset Lift Scheduling Kit
The Crane & Specialty-Asset Lift Scheduling Kit takes your crane, boom-lift, and telehandler assignments and forces a certified operator onto every lift before the date is set. You paste in your specialty class list, schedule each lift by date with its paired operator, and a cert-expiry cross-check flags any lift whose assigned operator's certification lapses before the lift date — measured against a date you set, not today's date. A concatenated key column catches both operator and crane double-bookings. Every cert date, cost, and warning window is a number you enter; the kit ships no rates, no benchmarks, and no compliance judgment of its own.
Instant download · all sales final. Refund policy
What's included
- Instant download after purchase
- Lifetime re-download from your account
Ready for real-time conflict detection?
Equipment Scheduler Pro catches double-bookings before they happen — with a drag-and-drop Gantt calendar and operator scheduling included.
See plans starting at $199/mo →